The Bill of Quantities is normally prepared by a cost consultant or quantity surveyor, a role that is often assumed by the engineering firm in charge of design. This way, the scope and quantity of wor
| Founded year: | Not set |
| Funding rounds: | Not set |
| Total funding amount: | Not set |